Field Soft Picks

How to Tell If Your Kitchen Remodel Quote Is Fair

A kitchen quote is often the biggest check a homeowner writes for their house, outside of the house itself. It usually lands as a few pages of line items, abbreviations and allowances that are hard to judge if you've never built a kitchen.

I've been in remodeling since 1999. I started out running my own custom cabinet company building high-end kitchens and worked with other cabinet shops. For the past 11 years I've worked in home remodeling as a project manager, head carpenter and estimator. I've written kitchen bids, built from them and managed the jobs, and I've seen how a vague line on page two turns into an argument in week six.

This article won't tell you what your kitchen should cost. Nobody can do that from a blog post. It will show you how to read your quote so you can tell whether it's complete, clear and reasonable, and what to ask before you sign.

First, a reality check on cost

National numbers are useful as a sanity check, not a target. Here's what two well-known sources report:

Those ranges are wide for a reason. Each source defines "a kitchen remodel" differently, and your scope, region, cabinet grade and layout changes move the number a lot. If your quote is far outside these ranges, that's not proof of anything. It just means you should understand why.

What a complete kitchen bid includes

A fair quote is first a complete quote. Before you compare prices, check that the bid covers the whole job. A good kitchen bid should spell out:

  1. Demolition and disposal: removing old cabinets, counters, flooring and appliances, and hauling them away
  2. Protection and cleanup: floor protection, dust control and daily and final cleanup
  3. Rough work: any framing, plumbing, electrical, ventilation or drywall changes
  4. Cabinets: brand or shop, construction, door style, finish and a cabinet list or drawing (more on this below)
  5. Countertops: material, edge profile, templating, sink cutouts and backsplash height
  6. Backsplash: tile or material, square footage or area, and who supplies it
  7. Flooring: type, square footage, prep, and whether it runs under the cabinets or stops at them
  8. Plumbing fixtures: sink, faucet, disposal, and reconnecting the dishwasher and fridge water line
  9. Electrical: outlets, under-cabinet lighting, recessed lights, and appliance circuits
  10. Appliances: who supplies them and who installs them
  11. Paint and trim: walls, ceiling, casing and baseboard
  12. Permits and inspections (if required): who pulls them and whether the fees are included
  13. Payment schedule, change-order terms, timeline and warranty

If a line item isn't on the bid, assume it's not in the price until the contractor tells you otherwise in writing.

The cabinet section: where kitchen bids hide the most

Cabinets are usually the biggest line in a kitchen bid. HomeAdvisor lists all-in cabinet costs from $100–$300 per linear foot for stock to $500–$1,200+ per linear foot for custom (HomeAdvisor). That spread is why two "new cabinets" lines can be thousands of dollars apart and still both be honest.

Here's what I look for, line by line.

Box construction

The box is the cabinet itself, without the doors. Check for: - Material: plywood, particleboard or MDF. Each has its place, but you should know which one you're paying for. - Framed or frameless: framed cabinets have a face frame on the front. Frameless (often called European-style) don't. The choice affects the look, interior space and price. - Back panels, shelves and joinery: how thick are the backs and shelves, and how is the box held together?

If the quote just says "cabinets per plan," ask for the cabinet line's spec sheet.

Door style and drawers

Finish

Hardware

Crown, fillers and panels

These are the parts that make a kitchen look finished, and the ones I most often see missing or vague on quotes: - Crown molding and light rail - Fillers and scribe molding (the narrow strips that close gaps against walls) - End panels, appliance panels and the island back panel - Toe kick

If these aren't listed, ask whether they're included or will show up later as add-ons.

Install

Allowances: the number that isn't really a number

An allowance is a placeholder budget for something you haven't picked yet, like tile, lighting, a faucet or cabinet hardware. If you pick something pricier, you pay the difference.

Allowances are normal. The problem is allowances set too low, which make a bid look cheaper than it really is. For each allowance, ask:

A bid with realistic allowances may look more expensive than one with low allowances, but it's often the more honest bid.

Exclusions: read the "not included" list

Most bids list what's not included, either plainly or in the fine print. Common kitchen exclusions:

Exclusions aren't bad. They're honest. The key is that you know about them before you compare bids. One contractor's lower number may simply have more exclusions.

Payment schedule

A reasonable payment schedule ties payments to progress, not just dates. Watch for:

Rules on deposits vary by state, so check your state's consumer protection or contractor licensing office.

Change orders

Kitchens almost always have a few changes. The question is how they're handled. A good bid or contract says:

If the bid is silent on change orders, ask. Verbal "we'll figure it out" agreements cause a lot of remodeling disputes.

Permits (If Required)

Whether you need a permit depends on where you live. Some areas don't require one, and others do when plumbing, electrical or walls change, so check with your local building department. HomeAdvisor reports permits for a kitchen remodel cost $460 to $2,770, depending on scope and local rules (HomeAdvisor). If a permit is required, the bid should say who pulls it and whether the fee is included. Be cautious of a contractor who suggests skipping a permit that's required.

Red flags of a padded bid

Red flags of a lowball bid

A lowball bid can cost you more than a padded one:

Questions to ask your contractor

  1. What exactly is included, and what's excluded?
  2. What's the cabinet box material and construction? Can I see the spec sheet?
  3. Are crown, fillers, panels and toe kick included?
  4. Who installs the cabinets, and who handles damaged pieces?
  5. How were the allowances set? Can you show me what they buy?
  6. How are change orders priced and approved?
  7. What's the payment schedule, and what does the deposit pay for?
  8. Are permits required for this job? If so, who pulls them, and are the fees included?
  9. Can I see your license (if your state requires one) and certificate of insurance?
  10. What's the timeline, including cabinet lead time?
  11. What warranty do you give on labor and materials, in writing?

The bottom line

A fair kitchen quote is complete, specific and clear about what happens when things change. Price matters, but a clear bid at a fair price is worth more than a vague one that looks cheaper.


Want a second set of eyes on your kitchen quote?

If you've got a kitchen or cabinet quote and aren't sure what you're looking at, I offer remote reviews. You can book a 45-minute Cal Video call with a written summary, or get a written-only review. I'll go through it line by line and give you the questions to ask before you sign. It's advice only, and you make the decisions.

Learn about Kitchen & Cabinet Quote Reviews →

Not available for projects in Lucas, Wood or Fulton County, Ohio.

— Jeremy Skadeland, Field Soft Picks

Cost figures are national averages from the sources linked above, as of when they were checked. Your costs will depend on your region, scope and materials. This article is general information, not professional, legal or financial advice.